FASTER AND MORE RELIABLE

FASTER AND MORE RELIABLE

Production happens in parallel with the preparation of your lot and foundation, cutting construction time in half. Advanced engineering exposes potential issues before a single board is cut, drastically reducing material waste.

Work is conducted indoors, by full-time, highly-skilled tradespeople, eliminating weather and staffing delays. With Plant, you get a reliable schedule you can depend on.

Plant’s patented building system provides a level of scrutiny and quality assurance more common to manufacturing than construction—processes that are difficult (if not impossible) to replicate on a traditional job site. Walls, floors, and ceilings are built on jigs, ensuring that they are level, straight, and square. Full-time tradespeople work in a controlled environment, adhering to strict quality protocols.